Reduce heat loss with Froth-Pak PU foam

In a world of energy efficiency and sustainability, minimizing heat loss is a hot topic. Whether you are a homeowner looking to reduce your energy bills, a contractor looking for sustainable construction solutions or simply someone concerned with environmental conservation, one thing is certain: reducing heat loss is a crucial step towards a comfortable and energy-efficient living environment. In this informational article we take a closer look at one of the most effective methods to reduce heat loss: the use of Froth-Pak sprayable polyurethane foam (PU foam). We explain step by step how to reduce heat loss using Froth-Pak insulation foam.

The difference between Froth-Pak and traditional insulation materials

Complete airtightness cannot be created with many traditional insulation materials, such as glass wool. Seams and cracks at the connections create cold bridges. This is hermetically sealed with Froth-Pak insulation foam, guaranteeing airtightness. Moreover, Froth-Pak has the best lambda value and the product is easy to use.

Benefits of Froth-Pak:

  • Very high insulation value (lambda value 0.021).
  • Fine-celled moisture-proof system.
  • Fast curing in approx. 10 minutes.
  • Easy application.
Tip: read more about Froth-Pak in our informational article:: ‘Tips and tricks for using Froth-Pak insulation foam’.

Applying Froth-Pak step by step to reduce heat loss [manual]

We would like to walk you through the steps of reducing heat loss with Froth-Pak foam insulation. In the video below we apply Froth-Pak PU foam to the ceiling of a house. We support you throughout the process and show you all the steps in detail. We also take measurements before and after application to evaluate the effect. Please watch the video or read all the steps on this page.

Requirements

For this job you will need the following products:

Step 1. Heat the Froth-Pak

Before we start insulating the room, it is important that Froth-Pak is at the correct temperature. During processing, the temperature of the product must be between 20°C and 30°C. An optimal temperature gives maximum foam efficiency and faster curing. Use the special Froth-Pak heating jacket to heat the set. This heats the contents to the correct temperature, allowing you to spray the foam insulation without any problems.

Step 2. Remove old insulation material & prepare the surface

Now that the Froth-Pak is heating up, you can remove the old insulation. After removing the old insulation, it is important that you prepare the ceiling properly. Make sure that the places where the foam insulation will be placed are dry and free of grease. It is not possible to spray foam insulation on a damp surface or a surface with condensation or grease residue. In addition, tape off everything where you do not want foam insulation and move any cables to the side.

Step 3. Wear personal protective equipment

After curing, Froth-Pak is completely safe. It is important to protect yourself well during processing. Therefore, wear the correct personal protective equipment while working:

  • Disposable overalls.
  • Latex gloves.
  • Half face mask including filters.
Tip: with the PU safety kit you have the right protective equipment at your fingertips so you can get started safely with your insulation project.

Step 4. Getting the Froth-Pak kit ready for use

When the Froth-Pak has reached the correct temperature, prepare the set for use. Make sure you are using the Froth-Pak hose set and follow the steps below:

  • Connect both hoses to the correct cylinder using the colour indicated (red to red and blue to blue).
  • Tighten the nut on the hose set using the wrench provided.
  • Fully open the cylinders.
  • Spray the application gun with Vaseline.
  • Spray for 3 seconds into a plastic bag.
  • Clean the gun with PU cleaner.
  • Firmly click the nozzle into the application gun.

Step 5. Insulate the ceiling with Froth-Pak

Now that all preparations have been made, you can start processing the sprayable foam insulation.

  • Adhesive layer: first apply a thin adhesive layer with a quick sweeping motion. This layer ensures that the next (thick) layer adheres better. If you can touch the already sprayed layer without it sticking, you can spray the next layer.

  • Thick insulation layer: attach a new nozzle and spray with a slow sweeping motion to get a thick layer of about 1.5 cm. Then let the foam harden properly. 

Please note: the curing time of Froth-Pak depends on the ambient temperature. The higher the temperature, the faster the foam hardens.

Step 6. Remove the tape and excess foam insulation

Once the foam insulation has hardened, you can remove the tape and remove the excess foam insulation (you can use a saw or utility knife for this). You can then reassemble the ceiling. The ceiling is now successfully insulated.

In the before and after measurements in our instructional video you can see that we have reduced the heat loss from a difference of 3°C to a difference of 1°C.

Good luck with your project!

More information about insulation and reducing heat loss?

Do you still have questions about insulating with Froth-Pak or about reducing heat loss after reading this article and watching the video? Please feel free to contact our specialists. Send us a WhatsApp message or send an email to support@polyestershoppen.com. We will give you professional, personal and appropriate advice.

Product advisor
  • Expert advice
  • Superfast delivery with PostNL
  • Pay after delivery

Products used in this article

Product 1 of the 5

Do you have a question?

Do you have a specific question? Call one of our specialists for free advice +3185 0220090