Epifanes Epoxy HB Coat
At a glance
- Epoxy primer
- Anti-corrosive properties
- Water- and vapour-tight
Epifanes Epoxy HB Coat is a low-solvent, protective high-build coating based on modified epoxy resin. This two-component epoxy primer provides excellent corrosion protection, dries quickly, and has a high solids content. This allows a sufficiently thick dry layer to be built up in a short time. The coating is also highly resistant to mechanical stress and chemical exposure.
Application
Epifanes Epoxy HB Coat is ideal for quickly building a water- and vapour-proof layer on substrates such as polyester, sandblasted or manually derusted steel, aluminium, and (adhesive) wood. Suitable for both interior and exterior use, above and below the waterline. Additionally, this epoxy primer is highly effective as osmosis protection and for repairs to polyester.
Specifications
Contents: 750 ml
Base: epoxy resin
Gloss: semi-gloss
Colour: light grey or black
Mixing ratio (volume): 100 parts component A + 20 parts component B (5:1)
Mixing ratio (weight): 100 parts component A + 12 parts component B
Induction time: 15 minutes
Recommended film thickness: 100 - 200 µm wet = 85 - 175 µm dry
Thinner: Epifanes D-601
Dust dry: 2 hours (at 20°C)
Recoatable after: after 6 hours (at 20°C)
Fully cured: 24 hours (at 20°C)
Fully chemically cured: 5 days (at 20°C)
Coverage: approx. 6m2 per litre
Overcoatable (above the waterline): Epifanes Poly-urethane Yacht Paint or Epifanes Poly-urethane Primer
Overcoatable (below the waterline): Epifanes Interimcoat
Product properties
The key technical properties clearly listed in one place.
- Article number
- LAK002317
-
The technical product category, such as primer, resin, hardener or cleaner. It explains the product's purpose and helps you find other products with a similar function.
- Primer
-
The chemical base describes the chemistry of an adhesive, sealant, resin or coating, such as epoxy, polyester, polyurethane, (methyl)methacrylate or a hybrid polymer. It affects curing, flexibility and adhesion. Products with the same chemical base are not necessarily suitable for the same applications.
- epoxy resin
-
Some two-component paints and coatings need to rest for a specified period after components A and B are mixed. This waiting period, known as induction time, allows the chemical reaction to begin before application.
If the induction time is 15 minutes, wait that long before applying the product. Induction time is not automatically additional working time: for many products, working time starts as soon as the components are mixed. Follow the sequence and timings in the product instructions.
- 15 minutes
-
Mixing ratio indicates how much of each component is needed, for example resin (A) and hardener (B). A ratio of 100:50 by weight means 100 grams of A to 50 grams of B; by volume you might use millilitres. Weight and volume ratios are not necessarily the same because the components may have different densities. Accurate measuring is important for proper curing.
- 100:12 (by weight), 5:1 (by volume)
-
The overcoating interval tells you when the next layer of paint, varnish or coating may be applied. Many multi-coat systems specify both a minimum and a maximum interval:
- Minimum overcoating time: the previous layer is dry or cured enough to accept another coat.
- Maximum overcoating time: the period during which the next coat can bond without extra surface preparation under the stated conditions.
Overcoating too early can affect drying or the finish. Once the maximum interval has passed, cleaning and sanding may be needed to ensure adhesion between coats. Temperature and film thickness affect the waiting times.
- 6 hours (20 °C)
-
A paint or varnish layer is dust-dry when settling dust is less likely to stick to the surface. It may not yet be touch-dry, ready for overcoating or suitable for loading; these are different stages of drying and curing.
- 2 hours (20 °C)
-
Curing time is the period a product needs to reach a specified stage of cure. It is usually given in hours or days, often at a reference temperature such as 20 °C. A product may be tack-free or safe to handle before reaching its full mechanical and chemical resistance. Film thickness and mixed quantity may also affect the time.
- 1 day (20 °C)
-
Consumption or coverage describes how much product is needed for a given surface area. Consumption may be stated in g/m² or kg/m², while coverage is often given in m²/L or m²/kg. A consumption of 0.2 kg/m² means a theoretical 200 grams per square metre. Actual use depends on film thickness, substrate absorbency, application method and waste.
- 6 m²/L
-
A specific thinner that can be used, where permitted, to adjust a product's application properties or viscosity. The correct thinner and maximum quantity depend on the product. Incorrect thinning can affect coverage, drying and curing.
- Epifanes D-601
- Net contents
- 4 L, 750 ml
Reviews
Frequently bought together
Useful additions for your project.